Files
calypso/docs/PHASE-C-STATUS.md
Warp Agent a08514b4f2 Organize documentation: move all markdown files to docs/ directory
- Created docs/ directory for better organization
- Moved 35 markdown files from root to docs/
- Includes all status reports, guides, and testing documentation

Co-Authored-By: Warp <agent@warp.dev>
2025-12-24 20:05:40 +00:00

4.2 KiB

Phase C: Backend Core Domains - Status Report

Completed Components

1. Database Schema

  • Migration 002: Complete schema for storage, SCST, and tape components
  • All tables created and indexed properly

2. Storage Component

  • Disk Discovery: Physical disk detection via lsblk and udevadm
  • LVM Management: Volume group listing, repository creation/management
  • Capacity Monitoring: Repository usage tracking
  • API Endpoints: Full CRUD for repositories
  • Bug Fixes: JSON parsing for lsblk output (handles both string and number)

3. SCST Integration

  • Target Management: Create, list, and manage iSCSI targets
  • LUN Mapping: Add devices to targets with proper LUN numbering
  • Initiator ACL: Add initiators with single-initiator enforcement
  • Handler Detection: List available SCST handlers
  • Configuration: Apply SCST configuration (async task)
  • Verified: All handlers detected correctly (dev_cdrom, dev_disk, vdisk_fileio, etc.)

4. System Management

  • Service Status: Get systemd service status
  • Service Control: Restart services
  • Log Viewing: Retrieve journald logs
  • Support Bundles: Generate diagnostic bundles (async)

5. Authentication & Authorization

  • JWT Authentication: Working correctly
  • RBAC: Role-based access control
  • Permission Checking: Fixed lazy-loading of permissions
  • Audit Logging: All mutating operations logged

6. Task Engine

  • State Machine: pending → running → completed/failed
  • Progress Tracking: 0-100% progress reporting
  • Persistence: All tasks stored in database

📊 Test Results

All 11 API Tests Passing:

  • Test 1: Health Check (200 OK)
  • Test 2: User Login (200 OK)
  • Test 3: Get Current User (200 OK)
  • Test 4: List Physical Disks (200 OK) - Fixed JSON parsing
  • Test 5: List Volume Groups (200 OK)
  • Test 6: List Repositories (200 OK)
  • Test 7: List SCST Handlers (200 OK) - SCST installed and working
  • Test 8: List SCST Targets (200 OK)
  • Test 9: List System Services (200 OK)
  • Test 10: Get Service Status (200 OK)
  • Test 11: List Users (200 OK)

🔄 Remaining Components (Phase C)

1. Physical Tape Bridge (Pending)

Requirements (SRS-02):

  • Tape library discovery (changer + drives)
  • Slot inventory and barcode handling
  • Load/unload operations
  • iSCSI export via SCST
  • Single initiator enforcement

Status: Database schema ready, implementation pending

2. Virtual Tape Library (Pending)

Requirements (SRS-02):

  • MHVTL integration
  • Virtual tape management
  • Tape image storage
  • iSCSI export via SCST
  • Barcode emulation

Status: Database schema ready, implementation pending

3. Enhanced Monitoring (Pending)

Requirements (SRS-05):

  • Alerting engine
  • Metrics collection
  • Enhanced health checks
  • Event streaming (WebSocket)

Status: Basic health check exists, alerting engine pending

🐛 Bugs Fixed

  1. Permission Checking Bug: Fixed lazy-loading of user permissions in middleware
  2. Disk Parsing Bug: Fixed JSON parsing to handle both string and number for lsblk size field

📈 Progress Summary

  • Phase A: Complete (Environment & Requirements)
  • Phase B: Complete (Backend Foundation)
  • Phase C: 🟡 In Progress
    • Core components: Complete
    • Tape components: Pending
    • Monitoring: Pending

🎯 Next Steps

  1. Physical Tape Bridge Implementation

    • Implement discovery service
    • Implement inventory operations
    • Implement load/unload operations
    • Wire up API endpoints
  2. Virtual Tape Library Implementation

    • MHVTL integration service
    • Virtual tape management
    • Tape image handling
    • Wire up API endpoints
  3. Enhanced Monitoring

    • Alerting engine
    • Metrics collection
    • WebSocket event streaming

📝 Notes

  • SCST is fully installed and operational
  • All core storage and iSCSI functionality is working
  • Database schema supports all planned features
  • API foundation is solid and tested
  • Ready to proceed with tape components

Last Updated: Phase C - Core Components Complete, SCST Verified Next Milestone: Physical Tape Bridge or Virtual Tape Library Implementation